Compaction​

At Stone Beam Demolition, we specialize in delivering professional compaction services tailored to demolition projects in Dubai. Whether you’re preparing a site for a new structure or clearing land for development, our expert team ensures your foundation is compacted to perfection. With advanced machinery and a skilled workforce, we provide top-notch services that help avoid any future ground stability issues.

What is Compaction?

Compaction is the process of increasing the density of a material, such as soil or stone, by reducing the air gaps between particles. This is typically done using heavy machinery, such as rollers or compactors, which apply pressure to the material. The goal of compaction is to strengthen the material’s structure, making it more stable and able to support loads effectively.

In construction and demolition, compaction is crucial for ensuring that the ground or foundation is solid and stable before building structures or carrying out heavy operations. Proper compaction helps prevent settling, cracking, and shifting of structures over time, ensuring the safety and durability of buildings and roads.

What We Do:

  • Backfilling & Layered Compaction – Engineered lifts matched to material type and specification.
  • Roads & ROW Reinstatement – Subgrade, sub-base & basecourse compaction for trenches and crossings. (ROW works need RTA eNOC/permits.)
  • Basements & Foundations: Controlled fill around structures and utilities; settlement-aware sequences.
  • Utility Corridors: Bedding, shading, warning tapes, and reinstatement per DEWA/authority requirements.
  • Testing & Certification: Proctor (Standard/Modified), in-situ density (nuclear gauge or sand-cone), CBR and plate-load with reports to close inspections.

عملية الدمك لدينا (المتوافقة مع لوائح دبي)

  1. Pre-Construction & NOCs: Scope review, method statement, and eNOC/NOC coordination (RTA for ROW; DEWA/Dubai Municipality/DDA where applicable).
  2. Material Control: Approved fill sources, moisture conditioning, lift thickness set per spec.
  3. Layer-by-Layer Compaction: Rollers/compact equipment selected by soil class; continuous level/grade checks.
  4. QA/QC Testing: Lab Proctor (ASTM D698 Standard or D1557 Modified) defines target; field density by ASTM D6938 (nuclear) or sand-cone; CBR for subgrade confirmation where specified.
  5. Reinstatement & Handover: As-built levels, density results, and surface reinstatement to permit conditions.

Typical Dubai specs call for compliance with Dubai Municipality/DBC and relevant authority requirements; we achieve the stipulated %MDD (e.g., 95–98% as per project docs), documented via independent testing.

قدرات الأسطول والاختبار

  • المداحل: مداحل أسطوانية ناعمة ومدحل قدم الغنم بوزن 3–20 طن، وضاغطات للمشي خلفها (Walk-Behind Compactors)، ومدكاك (Rammers).
  • الدعم: صهاريج مياه، وجرّافات تسوية، وجرّافات مجنزرة (دوزر)، ورافعات؛ إرسال لدعم الطبقات المتواصلة مع أحجام نقل عالية.
  • الاختبار: مختبرات شريكة لاختبارات بروكتور (D698/D1557)، الكثافة النووية (D6938)، نسبة تحمل كاليفورنيا (CBR) (D1883)، لوح التحميل؛ وممارسات قياس الكثافة النووية (NDG) المعترف بها من قبل إدارة الطرق السريعة الفيدرالية (FHWA).

الامتثال ومكافحة المخاطر (ما يهم العملاء)

  • Safety & Public Protection: Works executed under Dubai’s Code of Construction Safety Practice and Dubai Building Code.
  • ROW/Street Works: RTA eNOC for trenching/reinstatement; adherence to permit conditions and traffic plans.
  • Utilities: DEWA reinstatement notes (e.g., approved backfill and procedures) followed for power/water corridors.

Areas We Serve:

  • Palm Jumeirah
  • Dubai Marina
  • JBR
  • JLT
  • Business Bay
  • Downtown
  • Al Quoz
  • Jebel Ali
  • Dubai South
  • Dubai Hills
  • Arabian Ranches
And Wider UAE on request.

Why Stone Beam for Compaction in Dubai UAE?

Successful projects in Dubai depend on proper backfilling and compaction—to spec, to schedule, and to local authority requirements. ستون بيم delivers production-grade compaction that keeps pace with large excavation/haul programs (300+ trips/day and 13,500 m³/day) and scales higher on request. Our teams coordinate permits/NOCs, protect adjacent assets, and hand over full QA/QC packs (density, CBR, levels). Dubai works must follow local codes and utility conditions; we plan and execute accordingly.

الأسئلة الشائعة

1. What compaction standard do you follow?

We set targets using ASTM D698 (Standard Proctor) or ASTM D1557 (Modified Proctor) per project specs, then verify field density with ASTM D6938 nuclear gauge or sand-cone tests.

2. Do you handle permits for trench reinstatement?

Yes. For works in public right-of-way, we coordinate RTA eNOC and follow permit conditions, traffic management, and reinstatement requirements.

3. Can your compaction keep up with fast excavation?

Yes. Our logistics and roller fleet are planned to match 300+ trips/day and ~13,500 m³/day programs, with surge capacity available on request.

Need compaction & backfilling in Dubai that’s permit-ready and inspection-proof?

Contact Stone Beam – we’ll align testing, logistics, and permits to your program and hand over a clean QA/QC dossier.