Stone Beam Demolition

Digital Demolition Waste Truck Tracking System in Dubai | Stone Beam


Designing a Digital System to Track Demolition Waste Trucks from Site to Landfill or Recycling Plant in Dubai

Once a truck leaves the site loaded with demolition waste, how do you prove, in real time, where it went, what it carried, and how it was treated?

In the UAE, construction and demolition (C&D) waste is a major environmental and regulatory focus. Dubai has introduced clear laws, circulars and technical guidelines to control waste collection, transportation, recycling and landfill operations. Law No. 18 of 2024 on waste management aims to minimise waste, promote private-sector investment, and push towards sustainable resource use. Dubai Land Department

Dubai Municipality’s waste department issues circulars dedicated to construction & demolition waste collection and transportation, and has implemented GPS-based tracking of waste management vehicles through systems like RASID, a smart platform that monitors waste transport operations and licensed companies in real time. Dubai Municipality+4Dubai Municipality+4Dubai Municipality+4

At the same time, modern waste-tech providers are introducing AI-driven platforms that combine IoT fleet tracking, sensor data and digital reporting to monitor construction waste, optimise routes and boost recycling. Waste Recycling+5Concept Zone LLC.+5SmartEnds+5

For a demolition specialist like Stone Beam Demolition, this is not just a legal requirement – it’s a strategic opportunity. A well-designed construction and demolition waste tracking system in Dubai can:

  • Protect the company against illegal dumping by subcontractors
  • Secure full compliance with Dubai Municipality / other emirate authorities
  • Provide developers and consultants (KEO, Emaar, etc.) with transparent ESG reporting
  • Optimise logistics, reduce costs and support the circular economy

This article explains, in practical detail, how to design a digital system to track demolition waste trucks from the demolition site all the way to the landfill or recycling plant, with Stone Beam Demolition as the reference contractor.


Why Digital Truck Tracking Matters for Demolition Projects in Dubai

Regulatory and market drivers in the UAE

Several trends make a digital tracking system non-negotiable:

  1. Stricter waste laws and circulars
    • Dubai’s waste management law and technical guidelines set requirements for waste classification, storage, transport and disposal (including recycling). Dubai Land Department+2Dubai Municipality+2
    • Dedicated circulars govern construction & demolition waste, specifying that only approved companies may collect and transport this waste, and that waste handling must follow municipality instructions. Dubai Municipality+1
  2. Mandatory GPS tracking and digital oversight
    • Dubai Municipality’s tracking circulars require licensed waste management companies to equip vehicles with tracking systems connected to municipal platforms (e.g., RASID). Dubai Municipality+2Dubai Municipality+2
    • Abu Dhabi’s EAD (Environment Agency – Abu Dhabi) has also introduced an integrated system that includes electronic tracking of waste transfer operations – a clear sign of where the entire UAE market is heading. Emirati Times
  3. Push towards circular economy & C&D recycling
    • The UAE has invested heavily in C&D waste recycling facilities and built a strong strategy to recycle construction and demolition waste. Emerald
    • Private platforms now offer AI-based classification and routing tools to maximise recycling of construction waste in Dubai. Concept Zone LLC.+2SmartEnds+2
  4. Developer and consultant expectations
    • Clients and consultants increasingly expect demolition contractors in Dubai to demonstrate traceability of every ton of waste, not just on paper, but with digital proof and dashboards.
    • Long-term relationships and prequalification often depend on being able to provide audited, data-backed waste reports.

Operational pain points on a typical demolition site

In real demolition projects, especially high-volume ones (e.g., bridge demolition, raft removal, tower demolition), the “old way” of tracking waste is risky:

  • Paper manifests get lost or filled incorrectly.
  • Subcontracted trucks may take shortcuts, dispose at unapproved locations, or split loads.
  • Loads may be misclassified (e.g., mixing hazardous, contaminated or asbestos-containing waste with inert rubble).
  • There is no reliable record of who generated the waste, which truck moved it, and which facility treated it.

From Stone Beam’s own engineering and HSE experience, a safe demolition operation already involves detailed structural analysis, method selection, and risk control – including careful planning of how debris will be removed and transported.

Extending this discipline to digital waste tracking is the natural next step.


Core Principles of a Construction & Demolition Waste Tracking System in Dubai

Before choosing devices, software or vendors, it helps to define what the system must achieve.

1. End-to-end visibility from site to landfill / recycler

1.Generated at a specific project zone or activity (e.g., slab cutting, wall demolition, hydrodemolition of a bridge deck).

Every load of demolition waste should have a complete digital journey:

1.Loaded into a tagged container/skip or truck.

2.Dispatched with a digital manifest including waste type, approximate quantity, source area and target facility.

3.Generated at a specific project zone or activity (e.g., slab cutting, wall demolition, hydrodemolition of a bridge deck).

4.Tracked via GPS and geofencing during transport.

5.Confirmed at landfill or recycling plant with time, GPS position, weight ticket and facility confirmation.

6.Stored for audits, monthly reports, and future analytics.

2. Data integrity and chain of custody

For Dubai Municipality and environmental authorities, it is not enough to track location – they want to ensure that:

  • Only licensed vehicles are used.
  • Waste is classified correctly according to official technical guidelines. Dubai Municipality+1
  • Loads are dispatched only to approved landfills and recycling plants.
  • There is a clear chain of custody between demolition contractor, transporter and facility.

Your digital system must therefore generate tamper-resistant records: each trip with unique IDs, timestamps, geo-coordinates, driver identity, and digital signatures or acknowledgements at both ends.

3. Safety, compliance and sustainability – not just GPS dots on a map

A robust demolition waste tracking system should support:

  • Safety – enforcing exclusion zones, preventing trucks from entering unsafe areas, and ensuring all loads follow designated safe routes.
  • Compliance – automatically cross-checking trips against permits, circulars and DM requirements. Dubai Municipality+2Concept Zone LLC.+2
  • Sustainability – measuring how much waste is recycled versus landfilled, and how demolition methods (e.g., selective demolition vs mechanical crushing) affect recoverable materials. Waste Recycling+1

System Architecture – What the Platform Looks Like in Practice

Field layer: trucks, containers, drivers and on-site devices

At the “edge” of the system, you have:

  • Waste trucks & trailers
    • Equipped with GPS/telematics devices, wired to ignition and power.
    • Optional onboard cameras (dashcams, side cameras) for route verification and incident evidence, similar to many waste management fleet systems in the market.
    • Integration to vehicle weight sensors or load cells (for approximate tonnage before reaching weighbridges).
  • Containers/skips and bins
    • Each skip is assigned a unique ID (QR code or RFID tag).
    • The ID is scanned when the container is filled, lifted, and tipped.
  • Driver mobile app
    • Works on Android/iOS, in Arabic and English.
    • Allows drivers to receive jobs, confirm loading, take photos of the load, and capture signatures at the disposal facility.
  • Site-level devices
    • Tablets for site engineers / waste coordinators.
    • Handheld scanners for QR/RFID.
    • Optional IoT level sensors in large bins to signal “ready for collection”. SmartEnds+1

Connectivity layer: GPS, IoT and government integration

This layer ensures continuous communication and regulatory integration:

  • Real-time GPS tracking of every demolition waste truck, either through the contractor’s system or via integration with a third-party provider (e.g., local telematics vendors already serving waste fleets in the UAE).
  • Geofencing of:
    • Demolition sites
    • Approved landfills
    • C&D recycling plants
    • Maintenance yards
  • API integration with municipal platforms such as Dubai Municipality’s RASID or similar tracking systems, so that authorities can view movements and verify compliance without manual reporting. Dubai Municipality+2Dubai Municipality+2

Application layer: web portal, mobile apps and control room dashboards

This is where Stone Beam’s team, clients and regulators interact with the data:

  • Operations dashboard
    • Live map of all active demolition waste trucks.
    • Status of each trip: “Loading”, “En route to landfill”, “At weighbridge”, “Returned”, etc.
    • Alerts for any route deviation, unauthorised stop, or entry into restricted zones.
  • Job management module
    • Site engineer creates digital waste jobs:
      • Project → Zone → Activity (e.g., “Zone B – hydrodemolition of pier 3”)
  • Expected waste type and quantity
  • Destination facility
  • Assigned transporter/vehicle
  • Jobs are pushed to driver apps and logged until completion.
  • Client/consultant view
    • Limited-access portal where the client can see:
      • Daily truck movements
      • Recycling vs landfill ratios
      • Specific trip proof for sensitive loads (e.g., chilled water pipe asbestos lagging)

Data & analytics layer

Data from all trips feed into a powerful analytics engine:

  • Waste flow analytics – tonnes per material type, per project, per month.
  • Recycling performance – recovery rate, comparison to targets. Waste Recycling+1
  • Fleet performance – average cycle time, idle time, fuel use, route efficiency. ConWize
  • Compliance indicators – % of trips to approved facilities only, number of deviations, missing manifests.
  • Carbon footprint estimation – emissions per ton of waste, per project.

Designing the Workflow: From Demolition Plan to Verified Disposal Ticket

A powerful system is useless without a disciplined, step-by-step workflow. Here’s a practical sequence tailored to demolition projects in Dubai.

Step 1: Pre-demolition planning & permitting

Before any wall is cut or slab is hammered, Stone Beam’s engineering and HSE teams already:

  • Prepare a demolition method statement and HSE plan in line with best practice (structural analysis, sequence of demolition, risk assessment, etc.).
  • Obtain demolition permits and utility NOCs (electricity, water, gas, telecom, drainage, roads, traffic) as required by Dubai Municipality and other authorities.
  • Carry out hazard surveys for asbestos, lead paints, silica dust and other dangerous materials, and define special disposal routes if needed.

At the same time, the project team designs the C&D waste management plan:

  • Estimate waste by type (concrete, rebar, masonry, metals, timber, glass, tiles, MEP, hazardous). AHR Group+1
  • Choose recycling vs landfill options, based on available local facilities. Emerald+1
  • Set up the digital tracking project in the system:
    • Project code + client
    • Geofence of site boundary
    • Expected duration and truck types
    • Linked permit numbers and authority references

Step 2: Waste classification & containerisation

As demolition progresses:

  • Waste is segregated at source as far as practical (e.g., metals vs concrete vs wood). AHR Group+1
  • Each skip, container or loose-load truck is assigned a unique ID.
  • Site teams capture:
    • Source area (zone/floor/pier)
    • Waste type (aligned with DM classification) Dubai Municipality+1
    • Approximate volume or weight

This information is entered into the tablet app or scanned from pre-printed QR labels.

Step 3: Digital dispatch & geofenced routing

The waste coordinator creates a trip job in the system:

  • Load ID → Vehicle → Driver → Destination (landfill or recycling plant).
  • Suggested route is generated using route optimisation, factoring in:
    • Traffic conditions
    • Restrictions (schools, hospitals, narrow streets)
    • Any authority-imposed routes for heavy vehicles.

Driver receives the job on their app, with:

  • Pickup location (site gate, specific loading point).
  • Drop location (exact gate at landfill or recycling plant).
  • Special instructions (e.g., “Hazardous waste – do not mix, go directly to Facility X”).

Step 4: Gate-in, loading, and departure from site

At the site gate:

  1. Security or gatekeeper scans the container/truck QR code.
  2. The system:
    • Confirms the truck is licensed for waste collection. Dubai Municipality+1
    • Checks the driver’s valid ID and training (optionally stored in the system).
    • Logs time, GPS position and odometer.

As the truck leaves the geofence, the system automatically changes status to “En route – loaded” and starts monitoring its adherence to the planned route.

Step 5: Monitoring the journey in real time

The control room (or even a laptop) shows live movement:

  • Any route deviation or prolonged unscheduled stop triggers an alert.
  • Geofencing ensures the truck does not enter sensitive areas (schools, hospitals, protected zones) or leave authorised corridors. Concept Zone LLC.+1
  • If the truck unexpectedly enters an unauthorised disposal site, the system flags a high-severity exception for investigation.

For large-scale bridge or infrastructure demolition, where heavy machinery and multiple spans are involved, this centralised monitoring complements structural safety planning and method selection (machine attachments, hydrodemolition, cutting, etc.) described in the demolition engineering literature.

Step 6: Arrival at landfill / recycling plant

At the landfill or recycling facility:

  1. The truck crosses the weighbridge, generating:
    • Gross weight
    • Tare weight
    • Net tonnage of waste
  2. The facility operator:
    • Confirms waste type and accepts or rejects the load.
    • Scans the trip QR code or enters a one-time PIN.
  3. The tracking system:
    • Captures time, facility GPS location and load outcome (accepted / rejected / partial).
    • Stores a digitised copy of the weight ticket (photo or direct data integration).

If the load goes to a recycling facility, the system tags it accordingly so that Stone Beam can report:

  • % of demolition waste that was recycled by mass
  • Which facilities handled which fractions (aggregates, metals, timber, etc.) Waste Recycling+1

Step 7: Monthly reporting and continuous improvement

Because everything is digital, generating monthly reports becomes almost automatic:

  • By project:
    • Total C&D waste generated (tonnage).
    • Tonnes to landfill vs recycling, recovery rate.
    • Number of trips, average turn-around time.
    • Any exceptions (deviations, rejected loads, non-compliant vehicles).
  • For authorities:
  • For clients & ESG reports:
    • Contribution to circular economy targets.
    • CO₂ avoided by recycling vs landfilling. Waste Recycling+1

Stone Beam’s management and HSE teams then use this data to refine future demolition methods, waste segregation strategies and logistics – just as structural modelling and FEM analysis are used to optimise safe demolition sequences in complex projects.


Functional Modules Your Digital Waste Tracking System Should Include

1. Fleet management & GPS tracking

  • Real-time location of every demolition waste truck.
  • Historical trip replay for investigations or audits.
  • Integration with vehicle health, maintenance, and driver behaviour analytics, similar to modern waste fleet platforms.

2. Digital waste manifests & QR codes

Replace paper forms with structured, digital manifests:

  • Mandatory fields:
    • Project & permit numbers
    • Waste generator (Stone Beam or subcontractor)
    • Waste type (aligned with DM classification) Dubai Municipality+1
    • Source area/zone
    • Destination facility
  • Each manifest becomes a QR code that:
    • Is scanned at loading, gate exit, and facility entry
    • Links all events for that load into one chain of custody record

3. Geofencing, alerts & exception management

  • Geofences around:
    • Site perimeter
    • Approved landfills and recycling plants
    • High-risk or restricted areas
  • Alerts:
    • Route deviation, idle time, speeding, unauthorised tip-off location
    • Trips without an associated manifest
    • Vehicles without valid permits or tracking devices (based on DM circulars). Dubai Municipality+2Dubai Municipality+2

4. Compliance & audit reporting

The system should make it easy to demonstrate compliance with:

  • Dubai Municipality’s waste regulations and circulars, including waste classification, storage and transport requirements. Concept Zone LLC.+3Dubai Municipality+3Dubai Municipality+3
  • Site HSE plans and demolition method statements, which often include requirements for exclusion zones, debris management, and control of dust, noise and vibration.

Features:

  • “One-click” download of trip histories for a specific period and project.
  • Digital archive of weight tickets, manifests and photos.
  • Access controls to limit who can edit or delete records.
  • Audit trail of any changes.

5. Sustainability & circular economy dashboards

Transform raw data into ESG metrics:

  • Recovery rate per project (% of waste diverted from landfill). Waste Recycling+1
  • Tonnes of concrete/aggregates sent to recycling vs landfill.
  • Metals recovered and sold.
  • Estimated carbon savings compared to baseline.

This is particularly powerful for developers and consultant teams who want to showcase sustainable redevelopment – for example, when demolishing an old structure to make way for a new, more efficient building.


How Stone Beam Demolition Uses Digital Tracking on Real Projects (Scenarios)

Below are illustrative scenarios showing how this system works in practice for a demolition contractor in Dubai like Stone Beam. SBDemolition

Scenario 1 – High-volume bulk demolition with 300+ truck movements per day

Project: Large raft foundation and superstructure demolition in an urban waterfront development.

Challenges:

  • High volume of concrete rubble, reinforcement and soil.
  • Tight construction programme and limited working hours.
  • Sensitive neighbours and busy road network.

How the system helps:

  • All excavators, crushers and loaders are coordinated with a live “truck queue” displayed on a tablet by the site waste coordinator.
  • Trucks are dispatched with slot times to prevent congestion at gate and landfill.
  • If any truck deviates to non-approved dump areas, the system immediately alerts Stone Beam management and the client.
  • Daily dashboards show:
    • Tonnes disposed
    • Average cycle time per truck
    • % utilisation of each transporter

Result: smoother logistics, lower fuel and idle time, plus full protection against liability for unauthorised dumping.

Scenario 2 – Inner-city selective demolition near sensitive neighbours

Project: Interior strip-out and partial demolition of a mixed-use building beside a hospital and residential towers.

Challenges:

  • Strict limits on noise, dust and vibration.
  • Narrow access and limited space for skips.
  • The hospital wants zero risk of contaminated debris or hazardous waste mismanagement.

How the system helps:

  • Waste is removed in small, frequent loads, each digitally logged.
  • Trucks are prohibited (via geofencing and route rules) from passing directly in front of the hospital or school entrances.
  • Hazardous fractions (e.g., asbestos-containing items, lead paint debris) have dedicated manifest templates and can only be dispatched to approved facilities. Dubai Municipality+2Dubai Municipality+2
  • The hospital receives a monthly summary showing how its neighbour’s demolition was handled safely and responsibly.

Scenario 3 – Government / developer projects with strict ESG reporting

Project: Redevelopment of an old bridge or infrastructure asset where demolition must protect sensitive environmental areas (e.g., waterfronts, Natura-like nature reserves).

Drawing from best-practice bridge demolition studies, safe demolition methods (cutting, hydrodemolition, controlled dismantling) are chosen to minimise impact on the environment and nearby structures.

The digital waste tracking system:

  • Separates loads of clean concrete destined for recycling from mixed or contaminated loads.
  • Provides regulators with evidence that no illegal dumping occurred in the sensitive zone.
  • Feeds into the project’s circular economy report, showing how much of the old structure was transformed into reusable aggregate for the new works. Waste Recycling+1

Implementation Roadmap for Demolition Contractors in the UAE

Phase 1 – Assessment & concept design

  • Map your current demolition operations:
    • How many projects?
    • How many trucks (own and subcontracted)?
    • Typical daily waste tonnage?
  • Review regulatory obligations (DM circulars, waste technical guidelines, landfill requirements). Concept Zone LLC.+4Dubai Municipality+4Dubai Municipality+4
  • Identify key stakeholders:
    • HSE and quality managers
    • Operations and logistics
    • IT / digital transformation
    • Key clients who demand advanced reporting

Produce a concept design document describing:

  • System objectives
  • Required modules and integrations
  • Phased roll-out strategy

Phase 2 – System design & vendor selection

Evaluate local and international waste management software and fleet tracking providers that already serve the UAE market. Tektronix LLC+2Efacility+2

Key evaluation criteria:

  • Arabic/English user interfaces
  • Integration options with:
    • DM platforms (e.g., RASID)
    • Landfill/recycling facility weighbridge systems
    • Existing GPS/telematics providers
  • Ability to customise:
    • Demolition-specific workflows
    • Waste classification lists
    • Site safety rules (e.g., exclusion distances, night work restrictions, etc.)

Phase 3 – Pilot on a live demolition project

Pick a medium-sized project with:

  • Manageable number of trucks
  • Cooperative client and waste transporters
  • Clear recycling opportunities

During the pilot:

  • Equip all waste trucks with trackers or connect existing units.
  • Train drivers, site teams and control-room staff.
  • Run the digital system in parallel with existing manual processes for 1–2 months.
  • Capture data to refine:
    • Manifest templates
    • Alert thresholds
    • Report formats required by the client and authorities.

Phase 4 – Roll-out, integration and optimisation

Once the pilot is successful:

  • Standardise the system as part of Stone Beam’s Demolition & HSE Procedures – i.e., no project starts without a configured digital tracking plan.
  • Integrate with:
    • ERP / finance (to link waste data to cost codes and subcontractor invoices)
    • HR (driver records, training and permits)
    • Business intelligence tools (for executive dashboards).

Continuously improve:

  • Tune KPIs (see next section).
  • Add advanced features (AI for route optimisation, predictive maintenance of trucks, automated anomaly detection). SmartEnds+1

Key KPIs and Monthly Dashboards for C&D Waste Tracking

To make the system valuable long term, Stone Beam should monitor clear, meaningful KPIs, such as:

  1. Total C&D waste generated (tonnes per project/month).
  2. Recycling rate (% diverted from landfill, overall and by material type). Waste Recycling+1
  3. Average truck cycle time (site → facility → site).
  4. Route compliance rate (% of trips without deviations).
  5. Manifest completeness (% of trips with full digital documentation and accepted weight ticket).
  6. Number of exceptions:
    • Unauthorised stops
    • Attempted tips at non-approved locations
    • Rejected loads at facility
  7. CO₂ per ton of waste, based on distance travelled and landfill vs recycling outcomes. ConWize
  8. Regulatory compliance score, e.g., percentage of trips fully compliant with DM tracking circulars and waste classifications. Dubai Land Department+3Dubai Municipality+3Dubai Municipality+3

These KPIs can be shown on project dashboards and rolled up to company-level dashboards for Stone Beam’s senior management.


FAQ – Digital Tracking of Demolition Waste Trucks in Dubai

1. Is digital tracking of demolition waste trucks mandatory in Dubai?
Dubai Municipality circulars require licensed waste management companies to equip vehicles with GPS tracking linked to approved monitoring platforms, and Law No. 18 of 2024 reinforces digital oversight of waste flows. While demolition contractors themselves may not own all the trucks, they are responsible for ensuring that waste is transported using compliant, trackable vehicles. Dubai Land Department+4Dubai Municipality+4Dubai Municipality+4

2. What data should a demolition waste tracking system capture?
At minimum: project ID, permit numbers, waste type and quantity, truck and driver IDs, GPS tracks, origin and destination geofences, facility name, weighbridge ticket details, and timestamps for loading and tipping. Photos of the load and digital signatures greatly strengthen the chain of custody.

3. Can Stone Beam integrate its system with Dubai Municipality’s RASID or other government platforms?
Yes, modern waste management software typically offers APIs that can integrate with municipal tracking systems like RASID, allowing authorities to view trips and verify compliance without manual reporting. This is aligned with DM’s push for digital tracking of waste management vehicles. Concept Zone LLC.+3Dubai Municipality+3Dubai Municipality+3

4. How does digital tracking help prevent illegal dumping by subcontractors?
Because every load is associated with a specific GPS track, geofenced destination and weight ticket, any attempt to tip at an unauthorised site or to “disappear” a load triggers alarms and leaves a visible data gap. Contractors can use this evidence to enforce contracts and, if necessary, remove non-compliant transporters from their approved list.

5. Is the system useful for small demolition projects too?
Yes. Even for smaller G+1 or villa demolitions, digital tracking simplifies documentation, ensures compliance with DM circulars, and reassures homeowners or small developers that their waste is handled legally and responsibly. Over time, aggregating data from many small projects reveals valuable performance and cost patterns.

6. What about hazardous demolition waste such as asbestos or lead-painted materials?
Hazardous waste requires specialised handling and disposal at approved facilities. A good system allows separate manifest templates and workflows for such loads, tracks them strictly, and stores all permits and disposal certificates for audits. This aligns with demolition safety guidance emphasising early identification and safe handling of asbestos, lead and other hazards.

7. How expensive is it to implement a demolition waste tracking system in the UAE?
Costs depend on the number of trucks, level of integration and choice of vendor, but most fleet tracking and waste management platforms use a subscription per vehicle plus modest setup fees. In practice, savings from reduced fuel, fewer disputes, optimised routing and avoidance of fines often outweigh the cost. Tektronix LLC+1

8. Can the system help with sustainability certifications or green building ratings?
Yes. By quantifying how much demolition waste is recycled and showing traceable evidence, the system supports sustainability reporting and can contribute to green building or ESG targets set by developers and investors. Waste Recycling+1

9. What if connectivity is lost when trucks travel to remote landfills?
Most telematics devices and driver apps can buffer data offline and sync automatically when connectivity is restored. The system should be designed with store-and-forward logic for such scenarios, ensuring that no trips are “lost”.

10. How does this system integrate with Stone Beam’s demolition engineering and HSE processes?
The same discipline applied to structural analysis, demolition sequencing, and site safety planning extends into waste management. Waste tracking becomes a standard section in Stone Beam’s method statements and HSE plans, just like monitoring vibration, dust, and structural stability during demolition.


if you’re planning a demolition project in Dubai , don’t settle for outdated methods or inflated prices. Stone Beam Demolition Company delivers professional, compliant, and competitively priced services that align with the highest standards of the UAE capital.

Related Topic

  1. Concrete cutting and drilling services in Dubai
  2. GPR Concrete Scanning Services in UAE
  3. الهدم المتحكم به
  4. Dubai Demolition Permit and Safety Requirements

أضف تعليق