Stone Beam Demolition

Excavation

Excavation Services in Dubai & UAE — Stone Beam

Why Choose Stone Beam for Excavation in Dubai

Excavation in Dubai demands speed, safety, and flawless coordination with local authorities. Stone Beam combines heavy capacity with permit expertise so your basement, foundation, or infrastructure works start on time and finish cleanly.

  • Proven Capacity: Over 300 truck trips per day and 13,500 m³ per day of bulk excavation — with resources to scale higher on request.
  • Permit-Ready Delivery: We coordinate eNOCs/permits with RTA (Right-of-Way), DEWA and Dubai Municipality, and free-zone authorities (e.g., DDA) before ground is broken. Dubai Development Authority+3RTA+3DEWA+3
  • Safety First: Compliance with Dubai’s construction safety code and utility NOC conditions; trial pits and verification to reduce strike risks. Dubai Municipality+1
  • Schedule Certainty: Parallel work fronts, accurate haul planning, and 24/7 shift options (where permitted) to hit milestones.

What We Do

  • Bulk Earthworks & Rock Breaking — Site cut/fill, bulk excavation for villas, towers, and infrastructure corridors.
  • Basement & Foundation Excavation — Multi-level basements, ramp cuts, blinding levels, bearing inspections.
  • Shoring & Ground Support — Sheet/soldier piles, secant piles, soil nails, struts/brace frames to protect adjacent assets.
  • Dewatering & Groundwater Control — Wellpoints/deep wells with monitoring to maintain stable, dry digs.
  • Utility Trenching & Service Crossings — Safe exposure, protection, and reinstatement of existing services.
  • Backfilling & Compaction — Layered backfill with density testing; final grading & proof-rolling.

Our Dubai Excavation Process

  1. Pre-Construction & Permits — Desktop utility study; eNOC/NOC submissions (RTA/DEWA/DM or zone authority) with method statements and traffic arrangements as required. RTA+1
  2. Trial Trenches & Verification — Targeted test pits to confirm as-built utility depths/alignments before bulk excavation. Dubai Supply Authority (DUSUP)
  3. Site Setup — Hoarding, fencing, traffic/pedestrian protection, haul routes, dust/noise control.
  4. Controlled Excavation — Machine control for grades; rock breakers as needed; continuous survey checks.
  5. Shoring & Dewatering — Engineered support systems and groundwater control to Dubai standards. Dubai Municipality
  6. Services & Backfill — Utility trenching, bedding, warning tapes; layered backfill with test reports.
  7. Handover — As-built levels, compaction results, and reinstatement per permit conditions.

Fleet & Resources

  • 20–35T excavators with rock breakers, graders, rollers, and loaders
  • Tracked dozers and a large tipper fleet orchestrated for 300+ daily trips
  • Shoring systems (sheet piles, trench boxes, braces), pumps & wellpoints
  • Total station/GNSS control for precision levels and volumes

Compliance in Dubai (What Clients Care About)

  • RTA Right-of-Way: eNOC/permits are required for works affecting public roads/ROW. RTA
  • DEWA: Dedicated NOC streams for electricity and water; construction NOCs must be in place before works commence. DEWA+2DEWA+2
  • Dubai Municipality Safety Code: Governs excavation risk controls, access/egress, shoring, and public protection. Dubai Municipality
  • Free Zone (e.g., DDA) Excavation Permits: Required for basements/foundations and site prep within their jurisdictions. Dubai Development Authority

Areas We Serve

Palm Jumeirah, Dubai Marina, JBR, JLT, Business Bay, Downtown Dubai, Al Quoz, Jebel Ali, Dubai South, Dubai Hills, Arabian Ranches — and wider UAE on request.

Proof of Capacity & Delivery

  • Throughput: 13,500 m³/day achievable on standard haul distances; surge capacity available for compressed programs.
  • Logistics: Staggered loading points, live dispatching, and synchronized weighbridge/tipping to avoid bottlenecks.
  • Quality & Reporting: Daily production dashboards, haul logs, and QA/QC packs (levels, compaction, photos).

FAQs

Can Stone Beam handle all excavation permits in Dubai?
Yes. We prepare and coordinate eNOCs/permits with RTA (ROW), DEWA (power/water), Dubai Municipality for safety compliance, and DDA in free zones. Dubai Development Authority+3RTA+3DEWA+3

How do you minimise utility-strike risk?
We review utility records and perform trial trenches to verify depths/alignments before bulk digging. Dubai Supply Authority (DUSUP)

Do you provide shoring and dewatering?
Yes — engineered shoring and wellpoint/deep-well dewatering aligned with Dubai’s safety code and permit conditions. Dubai Municipality

Need excavation done fast, safely, and fully compliant? Contact Stone Beam — we can mobilise for 300+ trips/day and 13,500 m³/day, and scale higher to match your program.

For inquiries about demolition and construction services and solutions

You can contact the support team via the following numbers