Interior strip-out, defined by the handover — not the label

Planned dismantling and removal of fit-out elements while the agreed structure, envelope and retained services stay in place — the endpoint written down before pricing.

Fit-out removal · office · lease handback

Overview

Non-structural — after that's been verified, not assumed

Planned dismantling and removal of specified fit-out elements from an existing building while the agreed structure, envelope, core, common systems and retained services remain.

The market also uses soft strip, fit-out removal, office reinstatement, interior demolition and back to shell — these phrases aren't automatically interchangeable. One landlord may mean exposed soffit and slab by "back to shell"; another may require a retained ceiling grid, capped base-build services, fire stopping and reinstatement drawings. The endpoint must be written down before pricing.

Request a demolition quote

Use this form layout on the live page to qualify leads before a call.






    Five handover models, five different critical questions

    The right model comes from the lease, landlord standard or client requirement — never assumed from the word "strip-out" alone.

    Handover model
    Typical outcome
    Critical question
    Partial strip-out
    Remove only elements affected by refurbishment or tenant change
    Which rooms, finishes and services remain?
    Back to shell
    Return the unit to an agreed exposed or base-build state
    Which floor, wall, soffit, MEP and fire-system endpoints define "shell"?
    Lease reinstatement
    Restore the landlord-required condition for tenant exit
    Which lease clauses, drawings and standards control acceptance?
    Clear-for-fit-out
    Leave the zone ready for the next contractor
    What making good, fixings, fire stopping and records are required?
    Phased handover
    Release rooms/zones in stages while others stay occupied
    What's the boundary, reopening rule and acceptance evidence per phase?

    "Complete strip-out" hides more than it states

    May be included: partitions, doors, glazing and ceilings within the approved boundary; floor and wall finishes to the specified substrate; joinery, furniture and tenant assets identified for removal; selected MEP and specialist systems after the responsible party has released them.

    Walls, slabs, stairs, beams, columns, façades or new openings need a separate selective/controlled demolition or cutting scope.

    Live-service isolation, test-for-dead, draining or certification stays with the responsible competent party.

    Temporary arrangements, impairment or reinstatement follow the building operator's process, not general strip-out speed.

    Surveys, specialist removal and disposal are a separate specialist scope, not a strip-out inclusion by default.

    Landlord, authority, developer or consultant fees and refundable deposits sit outside the physical works.

    Storage, insurance, resale or transport of salvage only where ownership and responsibility are written into the scope.

    Unknown services are treated as potentially live

    Strip-out frequently exposes systems installed by different tenants over many years — drawings may be incomplete, labels wrong, services crossing the unit boundary. Status is established by the responsible competent party before removal, not assumed.

    Isolation point & authorised person
    Where energy, water or signal is isolated, and who's competent to verify it.
    Removal endpoint
    Where Stone Beam stops — device, branch, riser, valve, panel or cap.
    Making good & retained function
    Cap, label, support, fire stop or test required, and what must stay operational.
    Image link

    "Low-disruption" isn't a method — specific rules are

    A generic promise isn't enough; the project needs operating rules for access windows, public/tenant separation, dust, noise, life safety and daily reopening.

    Why a universal AED/m² rate is weak

    Two units of the same area can carry very different fit-out density, MEP content and access constraints.

    Fit-out density
    Fit-out density Partitions, finishes, joinery quantity.
    MEP content
    Systems requiring release before removal.
    Access & logistics
    Lifts, loading bays, working hours.
    Protection requirements
    Common areas, retained finishes, façade.
    Waste route
    Segregation, salvage, hazardous streams.
    Making good & documentation
    Repair standard, close-out evidence.

    Not a fixed rate

    An itemised, project-specific quotation reflects the measured scope, MEP content, access and required handover documentation.

    An engineered service, not equipment for hir

    The method is selected after reviewing the structure, access, and risk — not chosen because it's the tool on the truck that day.

    The method, sequence and controls are confirmed from the actual site condition before any machine or tool is mobilised.

     

    Cutting, scanning, temporary support, lifting and waste handling coordinated under one plan, not fragmented between separate contractors.

     

    Scope, exclusions, assumptions and handover condition are stated in the quotation — not hidden inside a single lump-sum line.

    Equipment, certifications and capability are stated only where current records support them — never a generic "we do everything" promise.

    Why Stone Beam

    Common questions, answered straight

    What tenants, landlords and facility managers ask before they call.

    Strip-out removes specified fit-out while retaining the agreed structure and building systems. Structural or potentially structural removal belongs to a separate selective/controlled demolition scope with the required engineering and approvals.

    There's no single universal finish — it may mean exposed slab and soffit, retained base-build systems, capped tenant services, or another lease-defined condition. The endpoint should be written into the scope before pricing.

    Depends on the building, jurisdiction and scope — landlord approval is common, and formal fit-out, structural, fire-system or utility approvals may also apply.

    Yes, where the operator accepts the method and the project controls access, dust, noise, life-safety systems, debris movement, work windows and reopening criteria.

    Depends on system ownership, building rules and contract — facility management, a building-appointed contractor, the utility provider or another competent specialist. Removal starts only after required release evidence is confirmed.

    Only when an approved impairment/isolation/reinstatement arrangement identifies that scope — life-safety systems aren't disabled simply to accelerate strip-out.

    Only as a separately approved structural/selective-demolition or concrete-cutting interface — never implied as routine non-structural work.

    No contractor controls the landlord's lease decision — Stone Beam works to the agreed reinstatement scope and provides the specified close-out evidence, but the acceptance criteria and decision-maker belong to the lease.