Stone Beam Demolition is a Dubai-licensed demolition company for building and villa demolition up to G+12, controlled demolition, interior strip-out, concrete cutting, concrete scanning, and steel dismantling. Developers, main contractors, consultants, and property owners come to us to define what must be removed, what must remain, and who releases each stage — before a demolition price is agreed. Send the location, drawings and your remove/retain requirements, and our engineering team will turn them into a scope-led quotation.
Stone Beam credentials — check before you appoint
| Legal entity | STONE BEAM TECHNICAL SERVICES L.L.C., operating as Stone Beam Demolition |
| Dubai trade licence | No. 1563419 — Wrecking & Demolition Works is a licensed activity; valid until 13 November 2027 |
| DM practice permit | Wrecking & Demolition Works (G+12) and Concrete Restoration; valid until 13 November 2027 |
| Completed work | Parking-building demolition, Dubai Investment Park 2 — Dubai Municipality completion certificate dated 29 July 2026 |
| Engineering leadership | Eng. Awad Ashour — civil engineer with more than 15 years of demolition experience in the UAE |
| How to verify | Scan the QR code on the current trade licence, or check the practice permit on the Dubai Municipality engineering qualification portal using licence 1563419 |

Request a demolition quotation · Call +971 55 930 8594 · WhatsApp your project · Email your drawings
Demolition services in Dubai
A full building, an occupied office strip-out, and a single concrete opening need different methods, approvals, and handover terms. Start with the scope that matches your project:
| Service | What it covers | Learn more |
| Building demolition | Complete removal within the G+12 practice-permit category, including the agreed below-ground scope | Building demolition |
| Villa demolition | Villas, boundary walls, pools, ancillary structures and expressly specified foundations or basements | Villa demolition |
| Commercial demolition | Offices, shops and commercial buildings, in full or in defined areas | Commercial demolition |
| Interior strip-out | Finishes, partitions, ceilings and agreed services, including work around occupied areas | Interior strip-out |
| Controlled and selective demolition | Removal where retained structures or neighbouring assets set tight limits | Controlled demolition |
| Conventional demolition | Engineer-selected mechanical removal for suitable structures and site conditions | Conventional demolition |
| Concrete cutting, wire sawing and coring | Wall and floor sawing, diamond wire sawing and core drilling for engineer-released openings | Concrete cutting · Wire sawing · Core drilling |
| Concrete scanning (GPR) | Scanning before cutting or coring, with marked-up findings for the structural engineer | Concrete scanning |
| Robotic demolition | Remote-controlled equipment where access, exposure or the risk assessment favours it | Robotic demolition |
| Steel dismantling | Sheds, canopies, mezzanines and structural steel in an engineer-approved sequence | Steel dismantling |
| Industrial structures | The demolition side of plant and facilities after the operator’s specialist isolation and clearance | Industrial demolition |
| Bridges and infrastructure | Planning around traffic, utilities and authority interfaces; project suitability is assessed separately | Bridge demolition planning |
| Demolition waste | Segregation and loading on site, with transport coordinated through a licensed carrier | Demolition waste management |
Many projects combine several of these packages. Fixing a single method before the remove/retain boundary is agreed is one of the most common causes of variations and protection problems.
Why choose Stone Beam as your demolition company in Dubai
- Qualifications you can check. A current Dubai Municipality practice permit for Wrecking & Demolition Works (G+12) — verifiable on the authority portal, not just a services list.
- Engineer-led planning. Our founder, a civil engineer with 15+ years of UAE demolition experience, oversees Stone Beam’s engineering, method planning, and HSE delivery.
- One coordinated demolition package. Demolition, strip-out, concrete cutting, scanning, and steel dismantling are planned together, so interfaces are not lost between trades.
- Approval-ready submissions. Your consultant receives the project method statement and risk assessment for approval before work starts.
- Quotations you can compare. Foundations, cart-away, protection, and handover condition are marked as included, excluded, or by others, so scope gaps and exclusions are visible before award.
- Controlled debris and documented HSE. Segregation and loading on site, transport through a licensed carrier, and work under a documented HSE and environmental framework covering supervision, emergency planning and environmental controls.
Completed and appointed demolition work
A completion certificate, an appointment letter, and a method statement prove different stages of work. We label every reference by the stage its document actually supports:
| Reference | Stage | What the record shows |
| Parking-building demolition, Dubai Investment Park 2 | Completed | Dubai Municipality completion certificate dated 29 July 2026, naming Stone Beam Technical Services L.L.C. as the demolition contractor |
| Interior strip-out, occupied residential building | Appointed | Non-structural strip-out with retained services, protection and service-lift debris routes |
| Partition and blockwork demolition, occupied commercial building | Appointed | Upper-floor removal including bagging, vertical debris movement and basement loading |
During prequalification, you can review an appropriately redacted completion record and compare the completed scope with the work you are tendering.
Which demolition method suits your building?
The method follows the structural system, the stability of what remains, neighbouring property, access, permitted working hours and the debris route. A single project may need several methods.

| Method family | Usually considered when | Key decision before approval |
| Conventional mechanical demolition | A suitable building or isolated structure has adequate plant access and removal space | Structural assessment, exclusion zones, adjacent assets and debris handling |
| Controlled or selective demolition | Part of a structure remains, or neighbouring assets constrain removal | A defined remove/retain boundary and an approved engineering method |
| Remote-controlled (robotic) demolition | Restricted access or operator separation makes manual breaking less appropriate | Access, machine loads on the slab, retained structure and removal logistics |
| Saw cutting, diamond wire and coring | Openings or sections must be separated in a defined geometry | Scan findings, reinforcement/PT constraints, structural release and lifting plan |
| Soft strip and staged dismantling | Occupied premises or reusable elements make wholesale removal unsuitable | Service continuity, common-area protection and access windows |
For concrete openings, the sequence is survey → scan and report → engineer’s release → cut or core. Scanning informs the proposed positions; the structural engineer decides which openings can be released. Post-tensioned slabs need release by the structural and PT specialists, and industrial plant needs the operator’s isolation and clearance before dismantling starts.
The project-release pathway

Concept diagram: scope and release decisions, not a site-specific dismantling sequence.
Three documents answer three different questions: the company practice permit establishes eligibility, the project demolition permit authorises the specified work, and the completion certificate records close-out.
Demolition permits and NOCs in Dubai
The approving authority follows the plot’s jurisdiction, not the word “Dubai”. Dubai Municipality (DM), Dubai Development Authority (DDA) and Trakhees run separate demolition routes, and utility, telecom, developer and traffic permissions may apply alongside the main permit. A contractor’s G+12 practice permit is never a demolition permit for your site.

Published authority details (checked 9 November 2026):
- Dubai Municipality: its demolition-permit service catalogue gives the permit a three-month validity for full or partial demolition within DM jurisdiction. That is permit validity, not the time needed to demolish a building.
- Dubai Development Authority: the DDA Demolition Permit service names the contractor as the requester, lists an estimated five working days and a fee of AED 1,000 per unit per floor, plus AED 10 Knowledge Dirham and AED 10 Innovation Dirham per transaction. For mechanical demolition, it lists NOCs from DEWA and a telecom provider, together with a setting-out plan of the demolition area, hoarding layout, method statement, HSE and emergency plan with risk assessments, a neighbouring-building impact study, and a site photograph.
- DEWA: the demolition-permit electricity/water NOC service is listed as free, with 10 working days for the combined demolition approval. DM projects are submitted through the Dubai Building Permit System.
- Demolition Waste: DM Technical Guideline No. 3 — C&D Waste Collection and Transportation governs licensed road carriers, including vehicle registration and tracking under RASID.
These are authority charges and service targets for the named jurisdiction — not Stone Beam’s prices and not the demolition programme.
| Document or decision | Who normally provides or confirms it | What the buyer should ask for |
| Contractor licence and practice qualification | Contractor | Current licence and a G+12 category that matches the project |
| Project demolition permit | Competent authority, through the applicable applicant route | The approved permit for this plot and scope |
| DEWA, telecom and other service releases | Utility providers, with owner/applicant coordination | Written status of disconnection, clearance and conditions |
| Developer or community NOC | Owner, consultant or authorised applicant | Conditions on hours, access, neighbour protection and waste |
| Method statement and risk assessment | Demolition contractor; consultant/engineer reviews | An approved, scope-specific method and control measures |
| Waste transport and close-out records | Licensed carrier and project parties under the contract | Agreed disposal route and the records required at handover |
For step-by-step routes, read our Dubai demolition permit guide and demolition NOC guide.
What affects demolition cost in Dubai?
A reliable demolition contractor prices a defined removal scope, usually from a measured bill of quantities with lump-sum items for agreed site conditions. A per-square-metre figure on its own cannot tell you whether the basement, services, protection or disposal are included.
| Pricing driver | Question to settle before comparing bids |
| Structure and extent | Which storeys, elements, materials and below-ground components are included? |
| Demolition method | Do the constraints require a conventional, selective, robotic or cutting-led approach? |
| Retained property | Who provides surveys, temporary works, monitoring and protection? |
| Access and working hours | Are there restricted delivery windows, occupied areas or traffic controls? |
| Utilities and hazardous findings | Who arranges specialist investigation, clearance and isolation? |
| Debris and disposal | Are internal shifting, loading, haulage and authorised disposal included or priced separately? |
| Handover and documentation | Are final levels, clearance, completion records and follow-on works clearly allocated? |
Keep four cost categories apart: authority application charges, utility and account charges, engineering and protection measures, and the demolition contractor’s price.
Example — two villa-demolition offers (illustrative, not a Stone Beam project): one says “complete villa demolition”; the other says “structure and slab removal, foundations excluded, cart-away included”. Neither price is comparable until both state whether the boundary wall, ancillary buildings, foundations, buried obstructions, and off-site disposal are in scope. Mark uncertain substructure as investigation required and ask both bidders to price the same assumption.
The building demolition cost guide explains each driver in more depth.
How long does demolition take in Dubai?
There are two different clocks: the time to make a project ready to start, and the time to carry out and close out the approved work. Combining them into one universal duration is misleading.
| Programme stage | Main dependencies | What establishes readiness |
| Pre-demolition information | Drawings, structural condition, investigations, neighbour and access requirements | Agreed scope and a register of open information |
| Permits and NOCs | Plot jurisdiction, applicant responsibilities, utility and community conditions | Required approvals and releases in hand |
| Mobilisation and protection | Handover of the work area, logistics, hoarding and resources | Workfront-readiness checks |
| Physical demolition | Approved method, sequencing, access and material handling | Agreed progress records |
| Final clearance and handover | Debris route, contract deliverables and close-out requirements | Handover and completion evidence |
A published authority processing target does not include survey preparation, resubmissions, mobilisation or physical demolition. For houses, see the villa demolition timeline guide.
How to verify and compare demolition contractors in Dubai
Before appointing any demolition company in Dubai, remember that the useful prequalification question is not “Do you have a certificate?” but “What stage and scope does this document actually prove?”
| Evidence to check | What it establishes | What it does not establish |
| Legal entity and trade licence | The contracting company and its licensed activities | Approval to demolish your particular building |
| Company practice permit | The demolition category, e.g. G+12, and current qualification | A site-specific permit or unlimited height |
| Project demolition permit and NOCs | Approval for a defined location and activity, with conditions | Completion of the permitted works |
| Insurance schedule | Policy period, insured party and terms for review | Automatic cover for every method, hazard or subcontract |
| Completion certificate | Authority-recorded close-out of the described works | Unrecorded quantities, duration or a different project |
| Appointment letter, contract or PO | Engagement for a defined scope or stage | Actual completion and handover |
| Method statement and risk assessment | Proposed controls, sequencing principles and responsibilities | Proof that the site followed every step |
Six questions for your contractor shortlist
- Does the quotation name the exact legal entity and a matching demolition qualification?
- Has the contractor separated company eligibility from the project’s permits and utility releases?
- Does the proposal distinguish between remove, retain, and protect, including foundations and basements?
- Does the method address access, neighbouring assets, retained services and monitoring where relevant?
- Are waste transport, exclusions, provisional items and handover deliverables stated clearly?
- Are project references labelled accurately as completed, appointed or planned, with evidence?
Level the bids before comparing totals
The lowest total is not necessarily the lowest price for the same work. Ask every bidder to mark each item Included / Excluded / By Others / To Be Confirmed, state the measurement basis (m², m³, linear metres or lump sum) and name the responsible party. Then classify each offer:
- Comparable — removal boundary, approvals, waste and handover are aligned.
- Clarification required — a missing document or provisional item could change the scope.
- Not comparable yet — a major element such as foundations or off-site disposal is missing from one offer.
Our guide to comparing demolition quotations provides a full bid-levelling sheet.
What to send for a demolition quotation
Start with four details: project location, building or structure type, what must be removed or retained, and your contact details. For a fully defined technical and commercial proposal, add whatever you have from this list:
- Plot location and permitting jurisdiction (DM, DDA, Trakhees or other), if known.
- Building type, number of floors, and whether any part remains occupied.
- Architectural, structural, and as-built drawings, or a marked-up plan of removal areas.
- Basement, foundation, underground tank or buried-obstruction requirements.
- Elements to retain, protect or salvage, including operational services and access routes.
- Utility status and any available NOCs, disconnection or clearance records.
- Neighbouring buildings and any condition-survey or monitoring requirements.
- Site access, loading points, lifting limits, working hours and road restrictions.
- Whether loading, cart-away, and disposal are in the requested package.
- Required handover condition, BOQ (if any), target start, and quotation deadline.
Photographs or a site video help the first review. If information is missing, send what you have and flag the gaps — we separate confirmed scope from provisional assumptions. See what to provide when requesting a demolition quotation.
What happens after you send an enquiry
- Scope clarification: we separate the work to remove from the elements to retain or protect.
- Information review: we flag missing surveys, service information and engineering releases.
- Site discussion: we confirm access, neighbour constraints, working windows and waste logistics.
- Method and risk basis: we prepare the project approach and consultant-facing submittals.
- Commercial return: you receive a quotation stating inclusions, exclusions, assumptions and handover requirements.
Request a demolition quotation · Call +971 55 930 8594 · WhatsApp your project · Email your drawings
Frequently asked questions
Is Stone Beam licensed for building demolition in Dubai?
Yes. Stone Beam is a licensed demolition company in Dubai: Stone Beam Technical Services L.L.C. holds Dubai trade licence 1563419, with Wrecking & Demolition Works among its licensed activities, and a Dubai Municipality practice permit for Wrecking & Demolition Works (G+12) and Concrete Restoration. Both current records are valid until 13 November 2027.
Does the G+12 practice permit mean my project is already approved?
No. The practice permit sets the contractor’s category. Your building’s competent authority issues a separate demolition permit for the plot and approved scope, and utility, developer, and other NOCs may also apply.
Can you quote demolition from photographs alone?
Photographs help identify the general scope, access, and visible interfaces. A dependable quotation also needs the remove/retain boundary, drawings where available, below-ground assumptions, utility status, waste arrangement, and handover condition. Where information is missing, we state the assumption or propose an investigation allowance.
Why can two demolition quotations differ so much?
They usually price different work. Check foundations and basements, retained assets, protection, working hours, waste handling, authority responsibilities, provisional sums, and the handover standard before comparing totals.
How long does building or villa demolition take in Dubai?
It depends on two periods: approval readiness and the physical works programme. An authority processing target is not the total job duration. A project-specific timeline follows the structural assessment, scope, approvals, and access constraints.
Can demolition work take place while part of a building is occupied?
Interior strip-out can be planned around occupied areas, with service continuity, common-area protection, access windows, and debris logistics agreed from the outset. Structural changes need the responsible engineer’s release and any applicable approvals.
Who is responsible for demolition waste transport and disposal?
The contract should name who handles internal shifting, loading, transport, disposal, and handover records. Where cart-away is in our scope, we coordinate transport with a licensed carrier; the carrier and receiving facility issue the transport and receipt records.
Do you work outside Dubai?
Stone Beam is based in Dubai and considers projects elsewhere in the UAE according to the scope, local authority requirements, and available resources. Share the location with your enquiry so the right arrangements can be assessed.
Request a demolition quotation in Dubai
Planning a building demolition, villa demolition, interior strip-out, or concrete cutting package? Send the drawings, the elements to remove and retain, access information, and the handover condition you need. As an engineer-led demolition company in Dubai, we will review the inputs and come back with questions and a scope-led quotation for the agreed work.
Request a demolition quotation · Call +971 55 930 8594 · WhatsApp your project · Email your drawings
About the author — Eng. Awad Ashour, Founder & CEO. A civil engineer with more than 15 years of demolition experience in the UAE, he has led villa, building, basement, and enabling-works demolition and now oversees Stone Beam’s engineering, method planning, and HSE delivery. His professional experience predates the company and is presented separately from its own completion records.
Official sources (checked 9 November 2026): Dubai Municipality demolition-permit service; Dubai Development Authority demolition permit; DEWA demolition NOC; DM Technical Guideline No. 3 (PDF); DM engineering qualification portal. Authority fees and processing targets apply only to the named jurisdiction and service.







